Hydraulic calculation
Selecting pipe diameters for the network's real load and pressure.
Design and installation of water supply, sewage, drainage and gas supply systems for residential and commercial properties. From external networks to the building entry point.
Reliable utilities from inlet to outlet

Load calculation before selecting pipes and equipment.

UMB Group carries out the full cycle of utility network works — from design to commissioning, with approvals from relevant authorities where needed.
We use materials with a guaranteed service life and pressure-test every system before it's handed over for operation.
Selecting pipe diameters for the network's real load and pressure.
Pipes and fittings with a decades-long manufacturer warranty.
Checking tightness before access to utilities is closed off.
A full package of schemes and reports for future operation.
We coordinate all utilities with each other already at the design stage.
Pipes laid independently of each other are a source of future problems.
We plan the relative placement of water supply, sewage, drainage and gas to avoid crossings and simplify future maintenance.
Route calculation, pipe diameters and connection points to mains.
Trench excavation and base preparation for pipelines.
Laying water supply, sewage, drainage and gas networks.
Pressure testing, flushing systems and connecting to mains networks.
From external networks to internal distribution.

Domestic and storm sewage, local treatment facilities.

External and internal plumbing, pressure-boosting pump stations.

Diverting ground and surface water away from the foundation and plot.

External and internal gas networks with gas utility approvals.
Five stages of utility network installation.
Site analysis, load calculation and network routing.
Obtaining technical conditions from utility providers where required.
Trench excavation and base preparation for pipelines.
Laying and connecting water supply, sewage and drainage systems.
Checking the tightness and performance of systems under pressure.
Connecting to mains networks and handing over as-built documentation.
We work with certified pipes and fittings that comply with current sanitary and building codes.
We check every joint before the trench is backfilled.
Checking pipeline tightness under working pressure.
Compliance with designed gradients for gravity sewage.
Welding and connecting pipes per manufacturer technology.
Laying pipes below the soil freezing depth.
Documenting concealed works before trenches are backfilled.
A written warranty on installed utility networks.
We reply within a day — by phone, email or Telegram